Appendix E—Links
Chapter 1—Introduction
Chapter 2—Advance Notice and Coordination of Planned Street Work
Section 2.2 NYC DOT's Capital Project Map Portal and Other Online Information
Section 2.3 Key Principles for Effective Notice and Coordination of Major Planned Street Work
Chapter 3—Permits and Approvals
Section 3.2 The Permitee Registration Process
3.2.1 Required Documentation for a Permittee Registration Application
Section 3.3: The Permit Application Process (Non-Emergency Work)
3.3.1 Common Requirements for All Permit Types
3.3.2 Application Procedures for a Street Opening Permit
3.3.3 Application Procedures for a Building Operations/Construction Activity Permit
3.3.4 Application Procedures for a Sidewalk Construction Permit
3.3.5 Permit Application Review and Issuance (for Street Opening, Building Operations/Construction Activity, and Sidewalk Construction Permits)
3.3.6 Permit Renewals and Re-Issuances (for Street Opening, Building Operations/Construction Activity, and Sidewalk Construction Permits)
Section 3.4: Canopy Authorization and Permits
3.4.1 Application Procedure for Canopy Authorizations and Permits
Section 3.5: Other Provisions Pertaining to Permits
3.5.1 Holds
3.5.3 Other Actions
Section 3.6: Emergency Work and Special Circumstances
3.6.1 Emergency Utility Access Cover Openings and Emergency Street Openings
3.6.2 Embargoes
Section 3.7: Vault Approvals
3.7.3 Vaults Requiring a Revocable Consent
Chapter 4—Executing Work in the Street
Section 4.1: General Requirements For Executing Work
Section 4.2: Street Opening/Excavation Requirements
4.2.1 New York 811, Inc.
Section 4.4: Sidewalk Repairs
Section 4.5: Street Construction Inspections and Enforcement
Section 4.6: Sidewalk Violation Inspections and Enforcement